CSD 3000
orCall 1 305 436-8228
Description
240 TPH Containerized Asphalt BATCH Mixing Plant
-No Concrete foundations needed
COLD FEED SYSTEM
- 9 to 15 m3 hoppers (as many as you need)
DRUM DRYER
-Both drying and screening takes place at the drum
BATCHING TOWER
-35 to 41 Ton Hot Bins storage
-Batch size 3,500 Kg
-Batch cycling time 45 secs
BAG HOUSE
-Fines Recovery System
Low transportation costs ( 100% ISO Sea Containers)
-Options , filler silo, RAP system, Silo system, tanks....
Specifications
Condition | New |
Stock Number | BATCH |